<sub id="pek6y"><big id="pek6y"><address id="pek6y"></address></big></sub>
  • <nav id="pek6y"></nav>
    <nav id="pek6y"><table id="pek6y"><meter id="pek6y"></meter></table></nav>
    <form id="pek6y"><th id="pek6y"></th></form>

      <form id="pek6y"><th id="pek6y"></th></form>

      <sub id="pek6y"><big id="pek6y"><address id="pek6y"></address></big></sub>

      <form id="pek6y"><tr id="pek6y"><span id="pek6y"></span></tr></form>
      <button id="pek6y"></button>
    1. Company Introduction
      Company Achievement
      Company News
      İ
      China Cenpower Achievement List (Part) HOME >> ENGLISH

      Commissioning Project Performance List (Large Unit)

      No.

      Project Name

      Time

      Unit Type

      Work Scope

      1

      Zaozhuang Bayi Thermal Power  Company 1x350MW Unit Commissioning of  Thermal Power Project

      09/2016

      Coal-fired UnitCFB

      Commissioning

      2

      Cogeneration project of Yellow River Delta (Binzhou) Thermal Co., Ltd
      Unit integrate startup commissioning and performance test of 11176t/h +1350MW-25.4MPa and 2450t/h+150MW-9.8MPa

      08/2016

      Coal-fired Unit

      Commissioning

      3

      Huadian Guoji (Shiliquan) Power Plant 1x660MW unit commissioning

      02/2016

      Coal-fired Unit

      Commissioning

      4

      State Power Investment Corporation New Banji Power Plant 2x1000MW unit commissioning

      02/2016

      Coal-fired Unit

      Commissioning

      5

      Shenhua Guohua (Shouguang) Power Plant 2x1000MW unit commissioning

      02/2016

      Coal-fired Unit

      Commissioning

      6

      Huaneng (Laiwu) Power Generation Limited 1x1000MW unit commissioning

      11/2015

      Coal-fired Unit

      Commissioning

      7

      Shengli Guodian (Dongying) Thermal Power Co., Ltd 1x600MW unit commissioning

      09/2015

      Coal-fired Unit

      Commissioning

      8

      Datang Power Generation (Binzhou) Co., Ltd 2x350MW unit commissioning

      08/2015

      Coal-fired Unit

      Commissioning

      9

      Guodian Taian Cogeneration Project Phase One 2x350MW unit commissioning

      04/2015

      Coal-fired Unit

      Commissioning

      10

      Shenhua Hequ 4x660MW test and combustion adjustment after overhauling

      02/2015

      Coal-fired Unit

      Test  and Combustion Adjustment

      11

      Jiaozuo Power Plant 2x660MW Commissioning

      01/2015

      Coal-fired Unit

      Commissioning

      12

      Shandong Xinfa Aluminum Industry 2x660MW unit commissioning

      01/2015

      Coal-fired Unit

      Commissioning

      13

      Huaneng Luoyang Thermal Power Plant 2x350MW unit commissioning

      01/2015

      Coal-fired Unit

      Commissioning

      14

      Shenhua Hefeng 2x350MW test and combustion adjustment after overhauling

      11/2014

      Coal-fired Unit

      Test and combustion adjustment

      15

      Tianjin Lingang Gas Turbine Cogeneration Project 2x450MW combined cycle unit commissioning

      09/2014

      Gas Steam Combined Cycle Unit

      Commissioning

      16

      Shandong Junan Liyuan Thermal Power Limited 1x350MW unit commissioning

      06/2014

      Coal-fired Unit

      Commissioning

      17

      Rizhao Lanshang Rizhao Steel 1x300MW unit commissioning                       

      07/2013

      Coal-fired Unit

      Commissioning

      18

      Shandong Haiyang Nuclear Power Plant Phase One 2x1250MW project conventional island commissioning and BOP Commissioning Technology Service Project                                

      07/2013

      Nuclear  Power Unit

      Commissioning

      19

      Zibo Huadian 1x330MW unit commissioning

      06/2012

      Coal-fired Unit

      Commissioning

       

       

       

       

       

      Commissioning Project Performance List (Small Unit)

      No.

      Project Name

      Time

      Unit Type

      Work Scope

      1

      Qingdao Runyi Clean Energy Co., Ltd Multi-purpose Project: Subsystem and integrate startup commissioning

      01/2015

      Coal-fired unit + Gas-fired unit

      Subsystem and integrate startup commissioning

      2

      Shandong Yunshi Thermal Power Co., Ltd 2x12MW thermal power project commissioning service

      12/2013

      Coal-fired Unit

      Subsystem and integrate startup commissioning

      3

      Shandong Wanshan Group Ltd 150t/h dry quenching technology reform project (25MW) waste heat unit integrate startup commissioning

      10/2013

      Coal-fired Unit

      Subsystem and integrate startup commissioning

      4

      Xinjiang Meihua Amino Acid LLC heat supply unit commissioning

      06/2012

      Coal-fired Unit

      Subsystem and integrate startup commissioning

      5

      Shandong Pingyuan Hanyuan Green Color Co., Ltd 2x15MW Cogeneration Project commissioning

      05/2012

      Coal-fired Unit

      Subsystem and integrate startup commissioning

      6

      Tangshan Sanyou Silicon Industry 1480t+1135MW unit commissioning

      2012.04

      Coal-fired Unit

      Subsystem and integrate startup commissioning

      7

      Fujian Xinhai Metallurgy Co., Ltd Blast Furnace Gas Electric Power Generation Project: Subsystem and overall commissioning (1X15MW)

      03/2012

      Coal-fired Unit

      Subsystem and integrate startup commissioning

      8

      Zhejiang Rongcheng Paper Industry 1220t/h+150MW unit commissioning                 

      05/2008

      Coal-fired Unit

      Commissioning, performance test and operation

       

       

       

       

       

      Commissioning Project Performance List (New Energy)

      No.

      Project Name

      Time

      Unit Type

      Work Scope

      1

      Lingbi Agriculture and Forest Biomass Power Generation Project Commissioning Service

      2016.12

      Biomass Power Generation

      Subsystem and integrate startup commissioning

      2

      Hengshui Taida Gucheng Biomass Power Generation Project (1x130t water cooled oscillating grate 1x30MW unit) Commissioning

      2014.12

      Biomass Power Generation

      Subsystem and integrate startup commissioning

      3

      Shandong Pingyuan Hanyuan Green Color Co., Ltd 2x15MW Cogeneration Project commissioning

      2012.05

      Biomass Power Generation

      Subsystem and integrate startup commissioning

      4

      Guoneng Bachu Biomass Power Plant 1x12MW unit commissioning

      2008.11

      Biomass Power Generation

      Subsystem and integrate startup commissioning

      5

      Guoneng Fugou Biomass Power Plant 1x12MW unit commissioning

      2007.11

      Biomass Power Generation

      Subsystem and integrate startup commissioning

      6

      Guodian Wudi Biomass Power Plant 275t/h+215MW unit commissioning

      2007.01

      Biomass Power Generation

      Subsystem and integrate startup commissioning

      7

      Guoneng Shanxian Biomass Power Plant 1x30MW unit commissioning
      This project was rewarded as 2009 Power Engineering High-quality Award

      2006.04

      Biomass Power Generation

      Subsystem and integrate startup commissioning

      8

      Guiyang Huaxi MSW Comprehensive Treatment Engineering unit commissioning

      2016.12

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      9

      Lingbi MSW Incineration Power Generation Project commissioning service

      2016.12

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      10

      Everbright International Tengzhou Environment-friendly Energy Power Generation Project Commissioning Service

      2016.08

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      11

      Everbright Pingdu MSW Incineration Power Generation Project Commissioning Service

      2016.07

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      12

      China Power Investment Corporation Haikou MSW Incineration Power Plant Extension Project unit commissioning

      2015.1

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      13

      Everbright Weifang MSW Incineration Power Generation Project Commissioning

      2015.03

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      14

      Sino-Germany Environmental Kunming Chenggong MSW Incineration Power Plant Commissioning

      2014.05

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      15

      Everbright Shouguang MSW Incineration Power Generation Innocent Treatment Project Commissioning

      2014.05

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      16

      Linyi Central New Energy Co., Ltd Waste Incineration Power Generation Project Commissioning Service

      2014.12

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      17

      Everbright Pizhou Waste Incineration Power Generation Project Phase One commissioning

      2013.11

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

      18

      Peking Gaoantun Waste Incineration Power Plant (Japan TAKUMA technology) commissioning

      2008.06

      Waste Incineration Power Generation

      Subsystem and integrate startup commissioning

       

       

       

       

       

      Commissioning Project Performance List (Overseas)

       

      No.

      Project Name

      Time

      Unit Type

       

      1

      Pakistan Nishat 1x46MW Coal-fired Project

      2015.12

      Commissioning, Performance test, training and operation

       

      2

      Banpu Lao Red Sand 2x660MW Unit Commissioning Management

      2015.03

      Commissioning Management

       

      3

      Indonesia PLN BBL2x16.5MW Power Plant Project  

      2014.12

      Project Management, commissioning, operation and performance test

       

      4

      CGNPC Singapore Biomass Power Generation Project (19.9MW) Commissioning

      2014.07

      Commissioning

       

      5

      Saud Za Val 126F gas combined cycle power plant

      2014.04

      Commissioning

       

      6

      Indonesia PLN NTT2x16.5MW Power Plant Project

      2013.08

      Project Management, commissioning, operation and performance test

       

      7

      India Timarpur Okhla Waste Management Company Private Limited Boiler Commissioning Project

      2011.08

      Waste Incineration Power Generation

       

      8

      Vietnam Coal Group 2X220t/h + 2X15MW unit

      2010.09

      Training, commissioning, operation guidance and performance test

       

      9

      Indonesia Banpu Group Botang 2X6MW unit installation and commissioning

      2010.01

      Installation and commissioning

       

       

       

       

       

       

      Commissioning Project Performance List (PT)

       

      No.

      Project Name

      Implementing Time

      Project Type

       

      1

      Yellow River Delta (Binzhou) Thermal Company 1x350MW unit

      2016.08

      PT

       

      2

      Pakistan Nishat 1x46MW Coal-fired Project

      2015.12

      PT

       

      3

      Guangzhou Waste Incineration Power Plant No. One

      2015.12

      PT

       

      4

      CGNPC Singapore Biomass Power Generation Project (19.9MW) Commissioning

      2014.07

      PT

       

      5

      Indonesia PLN BBL2x16.5MW Power Plant Project  

      2014.12

      PT

       

      6

      Indonesia PLN NTT 2x16.5MW Power Plant Project  

      2013.08

      PT

       

      7

      Vietnam Coal Group 2X220t/h + 2X15MW unit

      2010.09

      PT

       

      8

      Zhejiang Rongcheng Paper Industry 1220t/h+150MW unit commissioning                 

      2008.05

      PT

       

       

       

       

       

       

      Performance list of operation and operation guidance

       

      NO.

      Project Name

      Time

      Project Type

       

      1

       Pakistan Nishat 1x46MW Coal-fired Project

      12/2015

      Project management, commissioning, operation and PT

       

      2

      Indonesia PLN BBL2x16.5MW Power Plant Project

      12/2014

      Project management, commissioning, operation and PT

       

      4

      Indonesia PLN NTT2x16.5MW Power Plant Project

      08/2013

      Project management, commissioning, operation and PT

       

      5

      Vietnam Coal Group 2X220t/h + 2X15MW unit

      09/2010

      Training, commissioning, operation and PT

       

      6

      Indonesia Banpu Group Botang 2X6MW unit installation and commissioning

      01/2010

      Installation, commissioning and operation guidance

       

      7

      Zhoucheng Hongkuang Thermal Power Plant 2x12MW unit

      03/2011

      Commissioning, operation and guidance

       

      8

      Rizhao Lanshan Sanmu Group Thermal Power Plant 2x15MW unit

      06/2005

      Commissioning, operation and guidance

       

       

       

       

       

       

      Performance list of operation and operation guidance

       

      NO.

      Project Name

      Time

      Project Type

       

      1

      Henan CR Power Shouyangshan Co., Ltd 2016-2018 daily maintenance and overhaul of Shouyangshan desulfurization, ash handling and chemical common system

      04/2016

      Overhaul and maintenance

       

      2

      Huaneng Luoyang Thermal Power LLC 2016 Fuel System Equipment Maintenance and Regular Overhaul Contract

      01/2016

      Overhaul and maintenance

       

      3

      Huaneng Linyi Power Generation Co., Ltd ash silo equipment overhaul and maintenance as well as ash discharge operation contract

      12/2015

      Overhaul and maintenance

       

      4

      Three years' maintenance for ash handling system of unit#1 for State Grid Energy Hefeng Coal and Electricity Co., Ltd

      09/2015

      Overhaul and maintenance

       

      5

      Unit#1 overhauling of Indonesia PLTU 2 Nusa Tenggara Timur

      07/2015

      Overhaul and maintenance

       

      6

      2015 Shouyangshan uni#1 level C overhauling ESP and ash handling system overhauling

      04/2015

      Overhaul and maintenance

       

      7

      Huaneng Linyi Power Generation Co., Ltd ESP management contract of Boiler#5,6,7

      11/2014

      Overhaul and maintenance

       

      8

      Boiler#1 desulfurization and desulfurization common system maintenance contract for Junan Liyuan Thermal Power Co., Ltd

      08/2014

      Overhaul and maintenance

       

      9

      Boiler#2 desulfurization equipment level C overhaul contract for Huaneng Linyi Power Generation Co., Ltd

      08/2014

      Overhaul and maintenance

       

      10

      Huaneng Linyi Power Generation Co., Ltd Heat Exchange Station Electric Equipment Maintenance Contract

      05/2014

      Overhaul and maintenance

       

      11

      Huaneng Linyi Power Generation Co., Ltd desulfurization system#1 equipment overhaul and maintenance project

      07/2014

      Overhaul and maintenance

       

      12

      Electric primary and secondary equipment overhaul and maintenance contract of SPIC Shanxi Aluminum Industry Co., Ltd

      12/2013

      Overhaul and Maintenance

       

      13

      Hunan Changde Datang Shimen Power Plant 1x300MW unit Level A overhaul electric test

      05/2013

      Overhaul and Maintenance

       

      14

      State Grid Xinyuan Company Ltd Tianhuangping Hydropower Station 6x300MW, Langyashan Hydropower Station 4x150MW electric instrument test

      03/2013

      Preventive Test

       

      15

      Beijing Jingneng Future Technology City Gas Cogeneration Project Construction Service

      01/2013

      Construction Service

       

      16

      State Grid Energy Ningxia Coal and Electricity Co., Ltd Yuanyang Lake Power Plant 2x660MW Coal Mill Overhaul Project

      09/2012

      Overhaul and Maintenance

       

      17

      State Grid Energy Ningxia Coal and Electricity Co., Ltd Yuanyang Lake Power Plant Phase One 2x660MW Coal Pulverizing System Overhaul and Maintenance Service

            08/2012

      Overhaul and Maintenance

       

      18

      State Grid Energy Ningxia Coal and Electricity Co., Ltd Yuanyang Lake Power Plant 2x660MW Fuel System Equipment overhaul and Maintenance Service Contract

      07/2012

      Overhaul and Maintenance

       

      19

      State Grid Energy Hefeng Coal and Electricity Co., Ltd Phase One Project 2x300MW Subcritical Coal-fired Generator Set Ash Handling System Maintenance Project

      07/2012

      Overhaul and Maintenance

       

      20

      State Grid Energy Ningxia Coal and Electricity Co., Ltd Yuanyang Lake Power Plant Phase One 2x660MW Coal Yard Management Service Contract

      07/2012

      Overhaul and Maintenance

       

       

       

       

       

       

      Power Grid Performance List (Part)

       

      NO.

      Project Name

      Time

      Project Type

       

      1

      Huaneng Shandong Shidao Bay Nuclear Power Plant construction box transformer#4 translocation reform construction contract

      2016.1

      Power Grid Project

       

      2

      Jiayuan Jinli No.7 Zone 7 Substation installation project

      2016.07

      Power Grid Project

       

      3

      2016 Outsourcing construction service subcontract (Pingan, Guide, Xiaolitai Area)

      2016.06

      Power Grid Project

       

      4

      Huaneng Shandong Shidao Bay Nuclear Power Plant 2016 BOP Sub-item 35KV and below high and low voltage power supply and distribution system maintenance service

      2016.05

      Power Grid Project

       

      5

      State Grid Shandong Electric Power Company Jinan Changqing District Power Supply Company power distribution operation and overhauling business entrust technical service

      2016.04

      Power Grid Project

       

      6

      2015 Rural Power Grid transformation and upgrading project 10KV Wangong & line service subcontract project

      2015.1

      Power Grid Project

       

      7

      10KV Xiaosheng Line line maintenance project service subcontract project

      2015.09

      Power Grid Project

       

      8

      10KV Luan Line line maintenance project service subcontract project

      2015.09

      Power Grid Project

       

       

       

       

       

       

      Technical Consultation Project Performance List  (Part)

       

      NO.

      Project Name

      Time

      Project Type

       

      1

      Shenhua Shendong Electric Power Hequ 2x350MW low calorific value coal power generation newly-built project: protection setting value calculation

      2014.11

      Consultation

       

      2

      Shanxi Fugu Power Plant 2x600MW unit RB test and AGC optimization

      2014.12

      Consultation

       

      3

      Shenhua Hequ 4x660MW test and combustion adjustment after overhauling

      2014.11

      Consultation

       

      4

      Shenhua Hefeng 2x350MW test and combustion adjustment after overhauling

      2015.02

      Consultation

       

      5

      Huaneng Zhanhua Power Plant MCS commissioning of unit#3 low temperature economizer renovation project

      2015.05

      Consultation

       

      6

      Huaneng Zhanhua Power Plant MCS commissioning of unit#1 low temperature economizer renovation project

      2015.07

      Consultation

      : ޹˾ ַ: 혺Ӗ|66̖yH1̖3406 Ԓ: 0531-66683093

      ICP: ICP05041749̖

      <sub id="pek6y"><big id="pek6y"><address id="pek6y"></address></big></sub>
    2. <nav id="pek6y"></nav>
      <nav id="pek6y"><table id="pek6y"><meter id="pek6y"></meter></table></nav>
      <form id="pek6y"><th id="pek6y"></th></form>

        <form id="pek6y"><th id="pek6y"></th></form>

        <sub id="pek6y"><big id="pek6y"><address id="pek6y"></address></big></sub>

        <form id="pek6y"><tr id="pek6y"><span id="pek6y"></span></tr></form>
        <button id="pek6y"></button>
      1. 亚洲AV片不卡无码久久_风流老太婆大BBwBBwHD视频_免费观看久久精品视频_2020最新无码福利视频